Jan. 12th, 2009

birdwatcher: (Default)


Operation of the BONUS reactor was terminated in June 1968 because of technical difficulties and the ensuing need for high-cost modifications [1].
birdwatcher: (Default)


Operation of the BONUS reactor was terminated in June 1968 because of technical difficulties and the ensuing need for high-cost modifications [1].